Cutters perfomance in Tunnel Boring Machines according to position on the Cutterhead
The cutters in general are the essential elements to crush, break and move to the rock during an excavation. In particular case of the tunnel boring machines (TBM), the disc cutters play a preponderant role since the attack to the rock takes place only by compression and rotation of the cutterhead t...
| Autores: | , , |
|---|---|
| Tipo de recurso: | artículo |
| Estado: | Versión publicada |
| Fecha de publicación: | 2009 |
| País: | Perú |
| Institución: | Universidad Nacional Mayor de San Marcos |
| Repositorio: | Revistas - Universidad Nacional Mayor de San Marcos |
| Idioma: | español |
| OAI Identifier: | oai:revistasinvestigacion.unmsm.edu.pe:article/367 |
| Acceso en línea: | https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/367 |
| Access Level: | acceso abierto |
| Palabra clave: | Tunnel Boring Machine TBM disc cutters center cutter face cutter gauge cutters cutterhead Máquina tunelera cortadores de disco cortadores centrales cortadores frontales cantoneras cabezal |
| Sumario: | The cutters in general are the essential elements to crush, break and move to the rock during an excavation. In particular case of the tunnel boring machines (TBM), the disc cutters play a preponderant role since the attack to the rock takes place only by compression and rotation of the cutterhead that carries the cutters. The present research was carried out during the excavation of the Nº 4 headrace tunnel of the Yuncan hydroelectric project (Paucartambo II), located in Paucartambo district, Pasco province and department, where applied the MK 12 Atlas Copco Jarva TBM, that has 4.10 m cutterhead diameter provided with 27 disc cutters. From the pursuit of the cutters, its life in meters of excavated tunnel could be verified that, depends on its position in the mall pillow of a TBM, independent of the type of rock. It was possible to be demonstrated that the reinforcements (gauge cutters) are those of greater wearing down, followed by the frontals (phase cutters) and being of greater duration the power stations (to center to cutter). |
|---|