Economic assesment of measures for environmental recovery of excessively modified water masses. The case of Bajo Almanzora aquifer (Almeria)
[EN] The new water planning process promoted by the Water Frame Directive strengthens the need to achieve environmental objectives for each water mass through an assessment of a program of measures. The current study applies this WFD’s principle to the environmental recovery of an aquifer too deteri...
| Autores: | , |
|---|---|
| Tipo de recurso: | artículo |
| Fecha de publicación: | 2012 |
| País: | España |
| Institución: | Universitat Politècnica de València (UPV) |
| Repositorio: | RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia |
| Idioma: | español |
| OAI Identifier: | oai:riunet.upv.es:10251/117940 |
| Acceso en línea: | https://riunet.upv.es/handle/10251/117940 |
| Access Level: | acceso abierto |
| Palabra clave: | Aguas subterráneas Análisis coste-eficacia Contaminación nitratos Directiva Marco del Agua Objetivos ambientales Groundwater Cost-efficiency analysis Nitrates pollution Water Framework Directive Environmental objectives |
| Sumario: | [EN] The new water planning process promoted by the Water Frame Directive strengthens the need to achieve environmental objectives for each water mass through an assessment of a program of measures. The current study applies this WFD’s principle to the environmental recovery of an aquifer too deteriorated due to the pressure caused by nitrate pollution. This work applies cost-efficiency analysis to value direct and indirect costs caused by some measures for both the area and the province. Results show the importance of measures devoted to promote fertilization efficiency once complementary measures are implemented. |
|---|