Defining and Mitigating Flow Instabilities in Open Channels Subjected to Hydropower Operation: Formulations and Experiments

[EN] A thorough literature review was conducted on the effects of free surface oscillation in open channels, highlighting the risks of the occurrence of positive and negative surge waves that can lead to overtopping. Experimental analyses were developed to focus on the instability of the flow due to...

Descripción completa

Detalles Bibliográficos
Autores: Tavares, Miguel, Coronado-Hernández, Oscar E., Kuriqui, Alban, Ramos, Helena M., Pérez-Sánchez, Modesto|||0000-0001-8316-7778
Tipo de recurso: artículo
Fecha de publicación:2024
País:España
Institución:Universitat Politècnica de València (UPV)
Repositorio:RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Idioma:inglés
OAI Identifier:oai:riunet.upv.es:10251/211613
Acceso en línea:https://riunet.upv.es/handle/10251/211613
Access Level:acceso abierto
Palabra clave:Free surface flow
Flow control
Hydraulic jump
Narrowing cross-section
PID
INGENIERIA HIDRAULICA
06.- Garantizar la disponibilidad y la gestión sostenible del agua y el saneamiento para todos
07.- Asegurar el acceso a energías asequibles, fiables, sostenibles y modernas para todos
Descripción
Sumario:[EN] A thorough literature review was conducted on the effects of free surface oscillation in open channels, highlighting the risks of the occurrence of positive and negative surge waves that can lead to overtopping. Experimental analyses were developed to focus on the instability of the flow due to constrictions, gate blockages, and the start-up and shutdown of hydropower plants. A forebay at the downstream end of a tunnel or canal provides the right conditions for the penstock inlet and regulates the temporary demand of the turbines. In tests with a flow of 60 to 100 m3/h, the effects of a gradually and rapidly varying flow in the free surface profile were analyzed. The specific energy and total momentum are used in the mathematical characterization of the boundaries along the free surface water profile. A sudden turbine stoppage or a sudden gate or valve closure can lead to hydraulic drilling and overtopping of the infrastructure wall. At the same time, a PID controller, if programmed appropriately, can reduce flooding by 20¿40%. Flooding is limited to 0.8 m from an initial amplitude of 2 m, with a dissipation wave time of between 25 and 5 s, depending on the flow conditions and the parameters of the PID characteristics.