Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT)

The diagnosis of electrical installations included field visits, measurements of electrical parameters and power quality tests. Consequently, it was crucial to describe the current state of the company's electrical system in comparison with the current standards NTE INEN 2969 and ARCONEL, relat...

ver descrição completa

Detalhes bibliográficos
Autores: Salazar Aviles, Damaris Eunice, Placencio Macías, Jean Paul, Laverde , Cristian Samuel, Ortiz González, Yadyra Monserrath
Formato: artículo
Estado:Versión publicada
Fecha de publicación:2023
País:Ecuador
Recursos:Universidad Central del Ecuador
Repositorio:Revista Ingenio
Idioma:español
OAI Identifier:oai:revistadigital.uce.edu.ec:article/4222
Acesso em linha:https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222
Access Level:acceso abierto
Palavra-chave:Demanda
potencia instalada
calidad de energía
Auditoría energética
ahorro de energía
demand
instaled power
energy audit
energy savings
Descrição
Resumo:The diagnosis of electrical installations included field visits, measurements of electrical parameters and power quality tests. Consequently, it was crucial to describe the current state of the company's electrical system in comparison with the current standards NTE INEN 2969 and ARCONEL, related to lighting levels and energy quality, respectively. Since the installed load is broken down by zones and the group that represents the highest energy consumption per month is identified, the selection of measures to improve energy efficiency is based on an examination of the existing situation. The investigation demonstrates and concludes that the request for a modification in the rate schedule would mean a substantial saving of $2,579,904 per year.