“Sistema de aislamiento acústico para el área de generación eléctrica de la Estación Sacha Norte 2 en la empresa operaciones Río Napo Compañía de Economía Mixta”
ABSTRACT: This research was realized in the Operations Rio Napo company, a mixed economy company, whose mission is to develop and execute oil and gas activities with efficiency, transparency and socio-environmental responsibility, to provide financial resources to the Ecuadorian state. In all oil ac...
| Autor: | |
|---|---|
| Tipo de recurso: | tesis de maestría |
| Estado: | Versión publicada |
| Fecha de publicación: | 2016 |
| País: | Ecuador |
| Institución: | Universidad Nacional de Chimborazo |
| Repositorio: | Repositorio Universidad Nacional de Chimborazo |
| Idioma: | español |
| OAI Identifier: | oai:localhost:51000/3111 |
| Acceso en línea: | http://dspace.unach.edu.ec/handle/51000/3111 |
| Access Level: | acceso abierto |
| Palabra clave: | Sistema Aislamiento Acústico Estación |
| Sumario: | ABSTRACT: This research was realized in the Operations Rio Napo company, a mixed economy company, whose mission is to develop and execute oil and gas activities with efficiency, transparency and socio-environmental responsibility, to provide financial resources to the Ecuadorian state. In all oil activity, the power generation involves the use of internal combustion generators, that produce high levels of industrial noise, it is causing problems for workers and residents of the community in the area of direct influence of the Sacha field. Currently the noise is one of the most prevalent occupational hazards; so it is designated as a real public health problem, because of their hearing effects and extra-hearing The aim to achieve with this investigation topic is the implementation of a sound insulation system for the area of power generation Station Sacha Norte 2 in the Operations Rio Napo company of mixed economy. This is intended to create a suitable working atmosphere with noise levels permitted in the parameters established by Ecuadorian law. The aim to achieve with this investigation topic is the implementation of a sound insulation system for the |
|---|