Design of joint provision of tailings and clearence in Yauricocha mine

The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching fac...

ver descrição completa

Detalhes bibliográficos
Autores: Ortiz Sánchez, Oswaldo, Canchari Silverio, Godelia, Giraldo Paredez, Emiliano
Formato: artículo
Estado:Versión publicada
Fecha de publicación:2011
País:Perú
Recursos:Universidad Nacional Mayor de San Marcos
Repositorio:Revistas - Universidad Nacional Mayor de San Marcos
Idioma:español
OAI Identifier:oai:revistasinvestigacion.unmsm.edu.pe:article/763
Acesso em linha:https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/763
Access Level:acceso abierto
Palavra-chave:clearence
tailing
clearance’s holes
alkaline tailing
landfill
stable storage
desmonte
relave
vacíos en desmonte
relave alcalino
botadero
almacenaje estable
Descrição
Resumo:The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching facility of minerals in both, influence of seismic acceleration in the stability of tailing and clearance’s slopes. It was found that the most stable mixture from a physical and chemical point of view is three of clearance to one of tailing (3C/1T). The safety factor calculated by the Bishop algorithm SLIDE, is above 1.1 in pseudo-static conditions. In addition, there were evaluated more forms of joint storage for clearance-tailing, concluding that for the Yauricocha conditions, it can be used injections of thickened tailings through perforated pipes placed in the advancing front of the landfill. The injection can be prepared in clearing layers of 2.4 m of thickness on the pipe.