Analysis and modelling of longitudinal deformation profiles of tunnels excavated in strain-softening time-dependent rock masses

Rock mass behaviour model selection, in particular, to represent the post-failure behaviour and time-dependent behaviour of rock masses, are critical issues in the correct application of tunnelling design techniques such as the convergence-confinement method or numerical modelling. This study provid...

Descripción completa

Detalles Bibliográficos
Autores: Song, Fei|||0000-0002-3888-5786, Rodríguez Dono, Alfonso|||0000-0002-2296-4826, Olivella Pastallé, Sebastià|||0000-0003-3976-4027, Zhong, Zhen
Tipo de recurso: artículo
Fecha de publicación:2020
País:España
Institución:Universitat Politècnica de Catalunya (UPC)
Repositorio:UPCommons. Portal del coneixement obert de la UPC
Idioma:inglés
OAI Identifier:oai:upcommons.upc.edu:2117/346070
Acceso en línea:https://hdl.handle.net/2117/346070
https://dx.doi.org/10.1016/j.compgeo.2020.103643
Access Level:acceso abierto
Palabra clave:Tunneling
Post-failure behaviour
Time-dependent behaviour
Creep
Tunnelling
Longitudinal deformation profiles
CODE_BRIGHT
Túnels
Àrees temàtiques de la UPC::Enginyeria civil::Geotècnia::Túnels i excavacions
Descripción
Sumario:Rock mass behaviour model selection, in particular, to represent the post-failure behaviour and time-dependent behaviour of rock masses, are critical issues in the correct application of tunnelling design techniques such as the convergence-confinement method or numerical modelling. This study provides a general numerical approach for predicting longitudinal deformation profiles using a coupled ViscoElastic-ViscoPlastic Strain-Softening (VEVP-SS) model. A viscous dashpot and the strain-softening model are coupled to simulate the progressive damage process and creep failure behaviour of rock masses. Different failure criteria are considered to simulate the post-failure behaviour. As a verification step, numerical creep tests are carried out to analyse the coupled behaviour, and the basic viscoelastic and strain-softening results of the VEVP-SS model are compared with analytical solutions and numerical results. The proposed method is able to consider the coupling between post-failure behaviour and time-dependent behaviour, thus providing a new alternative method for preliminary tunnel design. Parametric analyses are then carried out to investigate the influence of different aspects on the longitudinal deformation profiles. The tunnel deformation based on the VEVP-SS model is larger than the corresponding elastic–plastic results due to the contribution of the creep behaviour, and the excavation rate becomes relevant when considering time-dependent behaviour.