Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement

Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come...

Descripción completa

Detalles Bibliográficos
Autores: Bautista Valhondo, Joaquín|||0000-0002-2214-4991, Alfaro Pozo, Rocío|||0000-0001-8214-1875, Batalla García, Cristina
Tipo de recurso: artículo
Fecha de publicación:2015
País:España
Institución:Universitat Politècnica de Catalunya (UPC)
Repositorio:UPCommons. Portal del coneixement obert de la UPC
Idioma:inglés
OAI Identifier:oai:upcommons.upc.edu:2117/88166
Acceso en línea:https://hdl.handle.net/2117/88166
https://dx.doi.org/10.1016/j.eswa.2015.07.044
Access Level:acceso abierto
Palabra clave:Production engineering
Sequencing
Mixed-product line
Work overload
Saturation
Activity factor
Manufacturing operations
Producció -- Organització
Treball -- Productivitat
Àrees temàtiques de la UPC::Economia i organització d'empreses
Descripción
Sumario:Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come from collective agreements and therefore must be respected by both company and labor unions. The first model takes into account the saturation limit of the workstations, and the second model also includes the activation of the operators throughout the working day. Two computational experiments were carried out using a case study of the Nissan motor plant in Barcelona with two main objectives: (1) to study the repercussions of the saturation limit on the decrease in productivity on the line and (2) to evaluate the recovery of productivity on the line via both activation of operators, while maintaining the same quality in working conditions achieved by limiting the saturation, and auxiliary processors. By results we state that saturation limitation leads an important increase of work overload, which means average economic losses of 28,731.8 Euros/day. However, the productivity reduction may be counteracted by the work pace factor increase, at certain moments of workday, and/or by the incorporation of auxiliary processors into the line.