Evaluating the 2014 retroactive regulatory framework applied to the grid connected PV systems in Spain

© 2016 Elsevier Ltd. The RD 413/2014 new economic and regulatory framework for producers of electricity from renewable energy sources in Spain has been here analysed, putting the focus on its impact on the economic results of the existing grid connected PV systems. A complete formulation of the new...

Full description

Bibliographic Details
Authors: Hoz Casas, Jordi de la|||0000-0001-7796-4535, Martín Cañadas, María Elena|||0000-0002-9905-7837, Miret Tomàs, Jaume|||0000-0003-1175-4900, Castilla Fernández, Miguel|||0000-0002-3284-860X, Guzmán Solà, Ramon|||0000-0002-4386-5800
Format: article
Publication Date:2016
Country:España
Institution:Universitat Politècnica de Catalunya (UPC)
Repository:UPCommons. Portal del coneixement obert de la UPC
Language:English
OAI Identifier:oai:upcommons.upc.edu:2117/90837
Online Access:https://hdl.handle.net/2117/90837
https://dx.doi.org/10.1016/j.apenergy.2016.02.092
Access Level:Open access
Keyword:Photovoltaic power generation
Feed in tariff (FIT)
Photovoltaic
Regulations
Renewable energy
Retroactivity
Spain
Energia solar fotovoltaica
Àrees temàtiques de la UPC::Energies
Description
Summary:© 2016 Elsevier Ltd. The RD 413/2014 new economic and regulatory framework for producers of electricity from renewable energy sources in Spain has been here analysed, putting the focus on its impact on the economic results of the existing grid connected PV systems. A complete formulation of the new remuneration scheme is first presented, making evident its high complexity and the great number of regulatory parameters involved. Then, in order to facilitate the discernment of its operating mechanism a simplified model is proposed. This approach has proven to be a useful tool to identify the most influential regulatory parameters and also which could be the plausible future regulatory actions in order to contain the cost to the Spanish Electricity System. Finally, the NPV and the IRR among other indicators are calculated for a representative case study facility, evidencing a substantial profitability reduction in the transition from the former economic and regulatory framework to the RD 413/2014 new remuneration scheme.