Proyecto básico de regeneración costera de la fachada marítima de Nules (Castellón). Alternativa 1

[EN] The next TFM has the objective of recovering the coastline of the municipality of Nules, being currently in a continuous process of recession, in which it is necessary to carry out the actions that have been studied. To solve this problem has been demolished the first line of centennial houses,...

Descripción completa

Detalles Bibliográficos
Autor: Alagarda Huguet, Joan
Tipo de recurso: tesis de maestría
Fecha de publicación:2018
País:España
Institución:Universitat Politècnica de València (UPV)
Repositorio:RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Idioma:español
OAI Identifier:oai:riunet.upv.es:10251/114502
Acceso en línea:https://riunet.upv.es/handle/10251/114502
Access Level:acceso abierto
Palabra clave:Breakwaters
Regeneration
Feeding
Coast
Promenade
Espigons
Regeneració
Alimentació
Passeig
Espigones
Regeneración
Alimentación
Litoral
Paseo
INGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTES
Máster Universitario en Ingeniería de Caminos, Canales y Puertos-Màster Universitari en Enginyeria de Camins, Canals i Ports
Descripción
Sumario:[EN] The next TFM has the objective of recovering the coastline of the municipality of Nules, being currently in a continuous process of recession, in which it is necessary to carry out the actions that have been studied. To solve this problem has been demolished the first line of centennial houses, which are within the "DPMT" and the concession period has been completed this year, in this area, will be located the future dune cord and the rear avenue of them a seafront with a curved design. On the other hand, the coastal dynamics and diverse provisions of breakwaters have been studied, choosing the most appropriate for the two stretches of coastline analyzed. Together with this provision, an artificial feed is made to facilitate the generation of the future plant of the beaches. Thanks to these actions, we will prevent the sea from affecting the first line of huts, since they would also have been demolished in this natural way, the current regulations will be complied with and the accessibility and overall quality of the Nules Beaches will be improved.