New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation
Traditionally, scheduling literature has focused mainly on solving problems related to processing jobs with non-assembly operations. Despite the growing interest in the assembly literature in recent years, knowledge of the problem is still in its early stages in many aspects. In this regard, we are...
| Autores: | , , |
|---|---|
| Formato: | artículo |
| Estado: | Versión publicada |
| Fecha de publicación: | 2024 |
| País: | España |
| Recursos: | Consejo Superior de Investigaciones Científicas (CSIC) |
| Repositorio: | DIGITAL.CSIC. Repositorio Institucional del CSIC |
| OAI Identifier: | oai:digital.csic.es:10261/386893 |
| Acesso em linha: | http://hdl.handle.net/10261/386893 https://api.elsevier.com/content/abstract/scopus_id/85202835049 |
| Access Level: | acceso abierto |
| Palavra-chave: | Tardiness Assembly Earliness Heuristics Just in time Scheduling |
| id |
ES_b67b9c67dbc92d0b97dc938245c23218 |
|---|---|
| oai_identifier_str |
oai:digital.csic.es:10261/386893 |
| network_acronym_str |
ES |
| network_name_str |
España |
| repository_id_str |
|
| spelling |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluationTalens, CarlaValente, Jorge M. S.Fernandez-Viagas, VictorTardinessAssemblyEarlinessHeuristicsJust in timeSchedulingTraditionally, scheduling literature has focused mainly on solving problems related to processing jobs with non-assembly operations. Despite the growing interest in the assembly literature in recent years, knowledge of the problem is still in its early stages in many aspects. In this regard, we are not aware of any previous contributions that address the assembly scheduling problem with just-in-time objectives. To fill this gap, this paper studies the 2-stage assembly scheduling problem minimising the sum of total earliness and total tardiness. We first analyse the relationship between the decision problem and the generation of the due dates of the jobs, and identify the equivalences with different related decision problems depending on the instances. The properties and conclusions obtained in the analysis are applied to design two constructive heuristics and a composite heuristic. To evaluate our proposals, different heuristics from the state-of-the-art of related scheduling problems are adapted, and a computational evaluation is carried out. The excellent behaviour of the proposed algorithms is demonstrated by an extensive computational evaluation.This research has been funded by the Spanish Ministry of Science and Innovation under project “ENSURE” with reference PID2022-142062OB-I00. In addition, this study has been funded by Instituto de Salud Carlos III (ISCIII) through the project “PI22/01096” and co-funded by the European Union .Peer reviewedElsevierEuropean CommissionMinisterio de Ciencia e Innovación (España)Instituto de Salud Carlos IIITalens, Carla [0000-0003-3689-6729]Valente, Jorge M. S. [0000-0001-5917-8880]Consejo Superior de Investigaciones Científicas [https://ror.org/02gfc7t72]202520252024info:eu-repo/semantics/articlehttp://purl.org/coar/resource_type/c_6501Publisher's versioninfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://hdl.handle.net/10261/386893https://api.elsevier.com/content/abstract/scopus_id/85202835049reponame:DIGITAL.CSIC. Repositorio Institucional del CSICinstname:Consejo Superior de Investigaciones Científicas (CSIC)Inglés#PLACEHOLDER_PARENT_METADATA_VALUE#info:eu-repo/grantAgreement/AEI/Plan Estatal de Investigación Científica y Técnica y de Innovación 2021-2023/PID2022-142062OB-I00The underlying dataset has been published as supplementary material of the article in the publisher platform at DOI https://doi.org/10.1016/j.cor.2024.106824https://doi.org/10.1016/j.cor.2024.106824Síinfo:eu-repo/semantics/openAccessoai:digital.csic.es:10261/3868932026-05-22T06:33:51Z |
| dc.title.none.fl_str_mv |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| title |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| spellingShingle |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation Talens, Carla Tardiness Assembly Earliness Heuristics Just in time Scheduling |
| title_short |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| title_full |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| title_fullStr |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| title_full_unstemmed |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| title_sort |
New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation: A computational evaluation |
| dc.creator.none.fl_str_mv |
Talens, Carla Valente, Jorge M. S. Fernandez-Viagas, Victor |
| author |
Talens, Carla |
| author_facet |
Talens, Carla Valente, Jorge M. S. Fernandez-Viagas, Victor |
| author_role |
author |
| author2 |
Valente, Jorge M. S. Fernandez-Viagas, Victor |
| author2_role |
author author |
| dc.contributor.none.fl_str_mv |
European Commission Ministerio de Ciencia e Innovación (España) Instituto de Salud Carlos III Talens, Carla [0000-0003-3689-6729] Valente, Jorge M. S. [0000-0001-5917-8880] Consejo Superior de Investigaciones Científicas [https://ror.org/02gfc7t72] |
| dc.subject.none.fl_str_mv |
Tardiness Assembly Earliness Heuristics Just in time Scheduling |
| topic |
Tardiness Assembly Earliness Heuristics Just in time Scheduling |
| description |
Traditionally, scheduling literature has focused mainly on solving problems related to processing jobs with non-assembly operations. Despite the growing interest in the assembly literature in recent years, knowledge of the problem is still in its early stages in many aspects. In this regard, we are not aware of any previous contributions that address the assembly scheduling problem with just-in-time objectives. To fill this gap, this paper studies the 2-stage assembly scheduling problem minimising the sum of total earliness and total tardiness. We first analyse the relationship between the decision problem and the generation of the due dates of the jobs, and identify the equivalences with different related decision problems depending on the instances. The properties and conclusions obtained in the analysis are applied to design two constructive heuristics and a composite heuristic. To evaluate our proposals, different heuristics from the state-of-the-art of related scheduling problems are adapted, and a computational evaluation is carried out. The excellent behaviour of the proposed algorithms is demonstrated by an extensive computational evaluation. |
| publishDate |
2024 |
| dc.date.none.fl_str_mv |
2024 2025 2025 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/article http://purl.org/coar/resource_type/c_6501 Publisher's version info:eu-repo/semantics/publishedVersion |
| format |
article |
| status_str |
publishedVersion |
| dc.identifier.none.fl_str_mv |
http://hdl.handle.net/10261/386893 https://api.elsevier.com/content/abstract/scopus_id/85202835049 |
| url |
http://hdl.handle.net/10261/386893 https://api.elsevier.com/content/abstract/scopus_id/85202835049 |
| dc.language.none.fl_str_mv |
Inglés |
| language_invalid_str_mv |
Inglés |
| dc.relation.none.fl_str_mv |
#PLACEHOLDER_PARENT_METADATA_VALUE# info:eu-repo/grantAgreement/AEI/Plan Estatal de Investigación Científica y Técnica y de Innovación 2021-2023/PID2022-142062OB-I00 The underlying dataset has been published as supplementary material of the article in the publisher platform at DOI https://doi.org/10.1016/j.cor.2024.106824 https://doi.org/10.1016/j.cor.2024.106824 Sí |
| dc.rights.none.fl_str_mv |
info:eu-repo/semantics/openAccess |
| eu_rights_str_mv |
openAccess |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Elsevier |
| publisher.none.fl_str_mv |
Elsevier |
| dc.source.none.fl_str_mv |
reponame:DIGITAL.CSIC. Repositorio Institucional del CSIC instname:Consejo Superior de Investigaciones Científicas (CSIC) |
| instname_str |
Consejo Superior de Investigaciones Científicas (CSIC) |
| reponame_str |
DIGITAL.CSIC. Repositorio Institucional del CSIC |
| collection |
DIGITAL.CSIC. Repositorio Institucional del CSIC |
| repository.name.fl_str_mv |
|
| repository.mail.fl_str_mv |
|
| _version_ |
1869417450182803456 |
| score |
15,812429 |