Sequentially alternating pollutant scenarios of phenolic compounds in a continuous aerobic granular sludge reactor performing simultaneous partial nitritation and o-cresol biodegradation

Industrial wastewater treatment plants must operate properly during the transient-state conditions often found in the industrial production. This study presents the performance of simultaneous partial nitritation and o-cresol biodegradation in a continuous aerobic granular reactor under sequentially...

Descripción completa

Detalles Bibliográficos
Autores: Suárez Ojeda, María Eugenia|||0000-0003-2520-2701, Pérez Cañestro, Julio|||0000-0002-0119-5570, Carrera, Julian|||0000-0002-2599-2312
Tipo de recurso: artículo
Fecha de publicación:2014
País:España
Institución:Universitat Autònoma de Barcelona
Repositorio:Dipòsit Digital de Documents de la UAB
Idioma:inglés
OAI Identifier:oai:ddd.uab.cat:166903
Acceso en línea:https://ddd.uab.cat/record/166903
https://dx.doi.org/urn:doi:10.1016/j.biortech.2014.03.071
Access Level:acceso abierto
Palabra clave:Partial nitrification
Aerobic granules
P-nitrophenol
Phenol
2-Chlorophenol
Descripción
Sumario:Industrial wastewater treatment plants must operate properly during the transient-state conditions often found in the industrial production. This study presents the performance of simultaneous partial nitritation and o-cresol biodegradation in a continuous aerobic granular reactor under sequentially alternating pollutant (SAP) scenarios. Three SAP scenarios were imposed during the operation of the granular reactor. In each one, a secondary recalcitrant compound (either p-nitrophenol (PNP), phenol or 2-chlorophenol (2CP)) were added for a short period of time to the regular influent containing only ammonium and o-cresol. Partial nitritation and o-cresol biodegradation were not inhibited by the presence of PNP or phenol and both compounds were fully biodegraded. On the contrary, the presence of 2CP strongly inhibited both processes within 2 days. However, the reactor was recovered in a few days. These findings demonstrate that treatment of complex industrial wastewaters with variable influent composition is feasible in a continuous aerobic granular reactor.