A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing

The U-shaped assembly line has received a considerable attention and has been widely used in industry in recent years due to the pressures of the just-in-time (JIT) manufacturing philosophy. However, balancing the U-shaped line is more difficult than balancing the traditional straight line. This stu...

Descripción completa

Detalles Bibliográficos
Autores: Fathi, M. (Masood)|||/items/7d328109-c2d3-4f38-9ff7-e2aec74d3a8d, Álvarez-Sánchez-Arjona, M.J. (María Jesús)|||/items/2ecac6d4-1c44-4ab4-ba92-0faf2c5da62b, Rodríguez-Chacón, V. (Victoria)|||/items/cd92ecb5-7362-4e4f-bb75-63258c62f14b
Tipo de recurso: artículo
Fecha de publicación:2016
País:España
Institución:Universidad de Navarra
Repositorio:Dadun. Depósito Académico Digital de la Universidad de Navarra
Idioma:inglés
OAI Identifier:oai:dadun.unav.edu:10171/113325
Acceso en línea:https://hdl.handle.net/10171/113325
Access Level:acceso abierto
Palabra clave:Assembly line balancing
U-shaped
Heuristic
Simulated annealing
Bi-objective
Descripción
Sumario:The U-shaped assembly line has received a considerable attention and has been widely used in industry in recent years due to the pressures of the just-in-time (JIT) manufacturing philosophy. However, balancing the U-shaped line is more difficult than balancing the traditional straight line. This study aims at balancing the U-shaped assembly line by introducing a novel heuristic which is based on the simulated annealing (SA) algorithm. The objectives to be optimised in this study are the number of workstations and balance efficiency. The performance of the proposed algorithm is examined by solving a set of standard test problems and a real case study. The results attained by the proposed algorithm were compared against the best known solution in the literature and it was found that the proposed algorithm is able to find good solutions in a reasonably short computational time.