Last planner control system applied to a chemical plant construction

The main difference between the Last Planner production control system developed by Ballard and classical control systems is the way in which projects are controlled and planned. The Last Planner system focuses on controlling production units, workflows and the quality of the performed work. It also...

Full description

Bibliographic Details
Authors: Nieto Morote, Ana María, Ruz Vila, Francisco de Asís
Format: article
Status:Versión aceptada para publicación
Publication Date:2012
Country:España
Institution:Universidad Politécnica de Cartagena(UPCT)
Repository:Repositorio Digital UPCT
OAI Identifier:oai:repositorio.upct.es:10317/4037
Online Access:http://hdl.handle.net/10317/4037
Access Level:Open access
Keyword:Project management
Last planner
Project performance
Proyectos de Ingeniería
Description
Summary:The main difference between the Last Planner production control system developed by Ballard and classical control systems is the way in which projects are controlled and planned. The Last Planner system focuses on controlling production units, workflows and the quality of the performed work. It also permits the identification of the causes for the non-completion of planned work and decision making in accordance with the project requirements so that actions are timely and productivity is increased. The objective of this paper is to present the results obtained from implementing the Last Planner system in the construction department of a chemical company. In this department, an information flow problem was detected among its members, in which supervisors lacked knowledge about the work to be performed until the project had been perfectly designed. This problem often led to meant long delays in the projects. The results from Last Planner system implementation show that identifying the constraints of the planned work leads to an improvement in the percentage and quality of completed activities