Use of partial load operating conditions for latent thermal energy storage management

A proper management of thermal energy storage (TES) charging and discharging processes allows the final users to optimize the performance of TES systems. In this paper, an experimental research is carried out to study how the percentage of charge in a latent heat TES system (partial load operating c...

Descripción completa

Detalles Bibliográficos
Autores: Gasia, Jaume, Gracia Cuesta, Alvaro de, Peiró Bell-lloch, Gerard, Arena, Simone, Cau, Giorgio, Cabeza, Luisa F.
Tipo de recurso: artículo
Estado:Versión aceptada para publicación
Fecha de publicación:2018
País:España
Institución:Varias* (Consorci de Biblioteques Universitáries de Catalunya, Centre de Serveis Científics i Acadèmics de Catalunya)
Repositorio:Recercat. Dipósit de la Recerca de Catalunya
OAI Identifier:oai:recercat.cat:10459.1/62701
Acceso en línea:https://doi.org/10.1016/j.apenergy.2018.02.061
http://hdl.handle.net/10459.1/62701
Access Level:acceso abierto
Palabra clave:Thermal energy storage
Latent heat
Phase change material
Partial load
Thermal management
Descripción
Sumario:A proper management of thermal energy storage (TES) charging and discharging processes allows the final users to optimize the performance of TES systems. In this paper, an experimental research is carried out to study how the percentage of charge in a latent heat TES system (partial load operating conditions) influences the discharge process. Several charging and discharging processes were performed at a constant heat transfer fluid (HTF) mass flow rate of 0.5 kg/s and temperature of 155 °C and 105 °C, respectively. High density polyethylene (HDPE) with a total mass of 99.5 kg was used as phase change material (PCM) in a 0.154m3 storage tank based on the shelland-tube heat exchanger concept. Five different percentages of charge have been studied: 58 %, 73 %, 83 %, 92 %, and 97 % (baseline test). Results showed that by modifying the percentage of charge, the time required for the charging process was reduced between 97.2% and 68.8% in comparison to the baseline case. However, the energy accumulated was only reduced a maximum of 35.1% and a minimum of 5.2%, while the heat transfer rates during the first 60 min of discharge were reduced a maximum of 45.8% and a minimum of 6%. Therefore, partially charging the TES system not lower than 85% of its maximum energy capacity becomes a good option if the final application accepts a maximum decrease of discharging heat transfer rates of 10% if compared to the fully charged system.