Optimal design of PV systems in electrical distribution networks by minimizing the annual equivalent operative costs through the discrete-continuous vortex search algorithm
This paper discusses the minimization of the total annual operative cost for a planning period of 20 years composed by the annualized costs of the energy purchasing at the substation bus summed with the annualized investment costs in photovoltaic (PV) sources, including their maintenance costs in di...
| Autores: | , , , , |
|---|---|
| Tipo de recurso: | artículo |
| Estado: | Versión publicada |
| Fecha de publicación: | 2022 |
| País: | España |
| Institución: | Universidad de Jaén |
| Repositorio: | RUJA. Repositorio Institucional de la Producción Científica de la Universidad de Jaén |
| OAI Identifier: | oai:ruja.ujaen.es:10953/6574 |
| Acceso en línea: | https://www.mdpi.com/1424-8220/22/3/851 https://doi.org/10.3390/s22030851 https://hdl.handle.net/10953/6574 |
| Access Level: | acceso abierto |
| Palabra clave: | annual operative cost discrete-continuous vortex search algorithm location and sizing of PV systems AC and DC distribution systems 621.35 |
| Sumario: | This paper discusses the minimization of the total annual operative cost for a planning period of 20 years composed by the annualized costs of the energy purchasing at the substation bus summed with the annualized investment costs in photovoltaic (PV) sources, including their maintenance costs in distribution networks based on their optimal siting and sizing. This problem is presented using a mixed-integer nonlinear programming model, which is resolved by applying a master–slave methodology. The master stage, consisting of a discrete-continuous version of the Vortex Search Algorithm (DCVSA), is responsible for providing the optimal locations and sizes for the PV sources—whereas the slave stage employs the Matricial Backward/Forward Power Flow Method, which is used to determine the fitness function value for each individual provided by the master stage. Numerical results in the IEEE 33- and 69-node systems with AC and DC topologies illustrate the efficiency of the proposed approach when compared to the discrete-continuous version of the Chu and Beasley genetic algorithm with the optimal location of three PV sources. All the numerical validations were carried out in the MATLAB programming environment. |
|---|