Estudio de alternativas para la optimización energética de una estación de bombeo de gran potencia (762 kW) con energía fotovoltaica en Picasssent (Valencia)

[EN] The objective of this study is to use the maximum possible of water from the Pinedo WWTP using a photovoltaic solar installation taking into account the existing infrastructure. In order to acomplish this objective, different options are proposed in the availability of water, in order to make t...

ver descrição completa

Detalhes bibliográficos
Autor: López Forés, Daniel
Formato: tesis de maestría
Fecha de publicación:2018
País:España
Recursos:Universitat Politècnica de València (UPV)
Repositorio:RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Idioma:español
OAI Identifier:oai:riunet.upv.es:10251/114923
Acesso em linha:https://riunet.upv.es/handle/10251/114923
Access Level:acceso abierto
Palavra-chave:Photovoltaic
Optimize
Batteries
Optimitzar
Bateries
Solar
EDAR
Fotovoltaica
Optimizar
Baterías
INGENIERIA HIDRAULICA
Máster Universitario en Ingeniería de Caminos, Canales y Puertos-Màster Universitari en Enginyeria de Camins, Canals i Ports
Descrição
Resumo:[EN] The objective of this study is to use the maximum possible of water from the Pinedo WWTP using a photovoltaic solar installation taking into account the existing infrastructure. In order to acomplish this objective, different options are proposed in the availability of water, in order to make the most of the existing infrastructure, and with these availabilities they propose a series of alternatives to find the optimal size of the installation. Previously I studied the price per watt that would cost the installation, in order to compare alternatives and the possibility of adding batteries to disconnect from the network is studied. At the end of the study, it is concluded that maintaining maximum constant availability throughout the year is the best option, both environmentally and economically with the size of the optimized installation.