Development of Hydrological Criteria for the Hydraulic Design of Stormwater Pumping Stations

[EN] For the design of stormwater pumping stations, there is often uncertainty regarding the selection of an appropriate rainfall event to determine the required pumping capacity and temporary storage volume for managing extreme events of a given magnitude. To account for the risk of system failure,...

Descripción completa

Detalles Bibliográficos
Autores: Arrieta-Pastrana, Alfonso, Coronado-Hernández, Oscar E., Fuertes-Miquel, Vicente S.|||0000-0003-3524-2555
Tipo de recurso: artículo
Fecha de publicación:2025
País:España
Institución:Universitat Politècnica de València (UPV)
Repositorio:RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Idioma:inglés
OAI Identifier:oai:riunet.upv.es:10251/230470
Acceso en línea:https://riunet.upv.es/handle/10251/230470
Access Level:acceso abierto
Palabra clave:Critical rainfall distribution
Hydrological model
Stormwater
Pumping stations
Descripción
Sumario:[EN] For the design of stormwater pumping stations, there is often uncertainty regarding the selection of an appropriate rainfall event to determine the required pumping capacity and temporary storage volume for managing extreme events of a given magnitude. To account for the risk of system failure, the return period is considered, as recommended based on the size of the catchment's drainage area or other considerations, depending on the local regulations of a country. This study focused on analysing the direct runoff volume from the catchment, the storage volume required for the operation of the pumping system, and the order of magnitude of the design flow rate. The results indicate that a rainfall event with a duration of at least twice the time of concentration should be used. The design flow rate should range between 50% and 70% of the peak discharge, and designing for flow rates near the peak is not advisable, as it can lead to intermittent pump operation and result in an oversized installed capacity. The methodology developed in this research was applied to the Coastal Protection Project located in the city of Cartagena, Colombia, which includes a 2045.6-m-long box culvert with a cross-sectional area of 2 x 2 m, and three pumping stations, each equipped with three pumps rated at 0.75 m3/s, for a total installed capacity of 6.75 m3/s.