Joint optimization of beam-hopping design and NOMA-assisted transmission for flexible satellite systems
Next-generation satellite systems require more flexibility in resource management such that available radio resources can be dynamically allocated to meet time-varying and non-uniform traffic demands. Considering potential benefits of beam hopping (BH) and non-orthogonal multiple access (NOMA), we e...
| Autores: | , , , , , |
|---|---|
| Tipo de recurso: | artículo |
| Fecha de publicación: | 2022 |
| País: | España |
| Institución: | Universitat Politècnica de Catalunya (UPC) |
| Repositorio: | UPCommons. Portal del coneixement obert de la UPC |
| Idioma: | inglés |
| OAI Identifier: | oai:upcommons.upc.edu:2117/369753 |
| Acceso en línea: | https://hdl.handle.net/2117/369753 https://dx.doi.org/10.1109/TWC.2022.3170435 |
| Access Level: | acceso abierto |
| Palabra clave: | Artificial satellites in telecommunication Resource allocation Telecommunication -- Traffic -- Management Multi-beam satellite systems Beam hopping Non-orthogonal multiple access Resource optimization Satèl·lits artificials en telecomunicació Assignació de recursos Telecomunicació -- Tràfic -- Gestió Àrees temàtiques de la UPC::Enginyeria de la telecomunicació::Radiocomunicació i exploració electromagnètica::Satèl·lits i ràdioenllaços |
| Sumario: | Next-generation satellite systems require more flexibility in resource management such that available radio resources can be dynamically allocated to meet time-varying and non-uniform traffic demands. Considering potential benefits of beam hopping (BH) and non-orthogonal multiple access (NOMA), we exploit the time-domain flexibility in multi-beam satellite systems by optimizing BH design, and enhance the power-domain flexibility via NOMA. In this paper, we investigate the synergy and mutual influence of beam hopping and NOMA. We jointly optimize power allocation, beam scheduling, and terminal-timeslot assignment to minimize the gap between requested traffic demand and offered capacity. In the solution development, we formally prove the NP-hardness of the optimization problem. Next, we develop a bounding scheme to tightly gauge the global optimum and propose a suboptimal algorithm to enable efficient resource assignment. Numerical results demonstrate the benefits of combining NOMA and BH, and validate the superiority of the proposed BH-NOMA schemes over benchmarks. |
|---|