Assessment of unintentional islanding operations in distribution networks with large induction motors

This paper is aimed at assessing the impact of unintentional islanding operations (IOs) in the presence of large induction motors (IMs) within distribution networks (DNs). When a fault occurs,followingthecircuitbreaker(CB)faultclearing,theIMsacttransientlyasgenerators,duetoits inertia, until the CB...

Full description

Bibliographic Details
Authors: Casals Torrens, Pau|||0000-0003-0464-3831, Martinez Velasco, Juan A., Serrano Fontova, Alexandre|||0000-0002-5147-6055, Bosch Tous, Ricardo|||0000-0003-0820-7834
Format: article
Publication Date:2020
Country:España
Institution:Universitat Politècnica de Catalunya (UPC)
Repository:UPCommons. Portal del coneixement obert de la UPC
Language:English
OAI Identifier:oai:upcommons.upc.edu:2117/178301
Online Access:https://hdl.handle.net/2117/178301
https://dx.doi.org/10.3390/en13020345
Access Level:Open access
Keyword:Electric generators
Electric inductors
Electric power production
Distribution network
Electromagnetic transient
Induction motor
Islanding operation
Modeling
Power system analysis
Generadors elèctrics
Inductors elèctrics
Energia elèctrica -- Producció
Àrees temàtiques de la UPC::Enginyeria elèctrica
Àrees temàtiques de la UPC::Enginyeria mecànica::Motors
Description
Summary:This paper is aimed at assessing the impact of unintentional islanding operations (IOs) in the presence of large induction motors (IMs) within distribution networks (DNs). When a fault occurs,followingthecircuitbreaker(CB)faultclearing,theIMsacttransientlyasgenerators,duetoits inertia, until the CB reclosing takes place. The present work is the outcome of a project carried out in a small DN, where ¿eld measurements were recorded over two years. This paper provides a detailed description of the test system, a selected list of ¿eld measurements, and a discussion on modeling guidelinesusedtocreatethemodeloftheactualpowersystem. Themaingoalistovalidatethesystem model by comparing ¿eld measurements with simulation results. The comparison of simulations and ¿eld measurements prove the appropriateness of the modeling guidelines used in this work and highlight the high accuracy achieved in the implemented three-phase Matlab/Simulink model