Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup

This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics a structural property is introduced. Such a property provides an upper bound on the idle time of the machines between the setup task a...

Full description

Bibliographic Details
Authors: Moccellin, João Vitor, Nagano, Marcelo Seido
Format: article
Status:Published version
Publication Date:2007
Country:Brasil
Institution:Universidade Federal do Ceará (UFC)
Repository:Repositório Institucional da Universidade Federal do Ceará (UFC)
Language:Portuguese
OAI Identifier:oai:repositorio.ufc.br:riufc/67105
Online Access:http://www.repositorio.ufc.br/handle/riufc/67105
Access Level:Open access
Keyword:Programação da produção
Flow shop permutacional
Tempos de setup
Description
Summary:This paper deals with the permutation flow shop scheduling problem with separated machine setup times. As a result of an investigation on the problem characteristics a structural property is introduced. Such a property provides an upper bound on the idle time of the machines between the setup task and the job processing. As an application of this property, the original scheduling problem with the makespan criterion can be heuristically solved by an analogy with the asymmetric traveling salesman problem.