Evaluation of the New Transformation Parameters between ITRF (IGS) and SIRGAS2000 at IBGE-PPP with Time Series Analysis

The IBGE-PPP, online Precise Point Positioning (PPP) service, estimates coordinates originally referenced to the materializations of the ITRF (IGS) and then make them compatible for SIRGAS2000 with the application of the Helmert transformation and its respective transformation parameters. On May 17,...

Descripción completa

Detalles Bibliográficos
Autores: Nascimento, Lécio Alves, Dal Poz , William Rodrigo, Freitas , Krisley Xavier Soares de
Tipo de recurso: artículo
Estado:Versión publicada
Fecha de publicación:2021
País:Brasil
Institución:Universidade Federal de Uberlândia (UFU)
Repositorio:Revista brasileira de cartografia - RBC (Online)
Idioma:portugués
OAI Identifier:oai:ojs.www.seer.ufu.br:article/57735
Acceso en línea:https://seer.ufu.br/index.php/revistabrasileiracartografia/article/view/57735
Access Level:acceso abierto
Palabra clave:IBGE-PPP
Helmert
Séries temporais
Parâmetros de transformação
Time series
Transformation parameters
Descripción
Sumario:The IBGE-PPP, online Precise Point Positioning (PPP) service, estimates coordinates originally referenced to the materializations of the ITRF (IGS) and then make them compatible for SIRGAS2000 with the application of the Helmert transformation and its respective transformation parameters. On May 17, 2020, IBGE-PPP started using a new set of parameters (P2), discontinuing the old set (P1). In this context, this work aims to assess the impacts of the new parameters on the compatibility of references and update of coordinates used by IBGE-PPP, based on the analysis of time series of data from two stations of RBMC, NAUS, and AMCO. Analyzing the time series SIRGAS2000 compatible with P1 (SCP1) and P2 (SCP2) for the two stations, it was observed that the series of north components (Δn) SCP1 showed level changes (differences) of approximately ± 0.017 m and –0.013 m in relation to SCP2, in the periods referring to the materializations of ITRF2005 (IGS05) and ITRF2014 (IGS14). The series of este (Δe) and vertical (Δu) SCP1 components also showed differences when compared to SCP2, but with magnitudes between 0.001 m and 0.006 m and 0.004 m and 0.012 m, respectively. Considering the sets of transformation parameters between the ITRF (IGS) and SIRGAS2000 materializations, it was observed that the SCP2 series showed more consistent results when compared to the SCP1 series, reducing the impacts caused by the exchange of references that occurred over time. In addition, the SCP2 series were compatible with the series referenced to ITRF2014 (IGS) at a level less than or equal to 0.002 m.