Loss of a 30" directional crossing due to pipeline collapse during pullback

This article concerns the loss of a Horizontal Directional Drilling crossing due to a failure that took place during pullback of the pipeline. The more than 500 m long drilling was meant to lodge a 30″ pipeline that crossed a large river. The failure caused the total loss of the crossing, and the ne...

Descripción completa

Detalles Bibliográficos
Autores: Booman, Janine, Kunert, Hernan Guillermo, Otegui, Luis Jose
Tipo de recurso: artículo
Estado:Versión publicada
Fecha de publicación:2013
País:Argentina
Institución:Consejo Nacional de Investigaciones Científicas y Técnicas
Repositorio:CONICET Digital (CONICET)
Idioma:inglés
OAI Identifier:oai:ri.conicet.gov.ar:11336/27589
Acceso en línea:http://hdl.handle.net/11336/27589
Access Level:acceso abierto
Palabra clave:Hdd Crossing
Pipe Collapse
Tunnel Loss
Failure During Pullback
https://purl.org/becyt/ford/2.3
https://purl.org/becyt/ford/2
Descripción
Sumario:This article concerns the loss of a Horizontal Directional Drilling crossing due to a failure that took place during pullback of the pipeline. The more than 500 m long drilling was meant to lodge a 30″ pipeline that crossed a large river. The failure caused the total loss of the crossing, and the necessity to repeat the entire process in another, less favorable location. Root causes involved a difficult soil composition, and constraints at a populated bank that led to engineering solutions not proved before on a pipe of such diameter. Discontinuities on the tunnel and the use of a sacrifice pipe at the front end of the pipe column, which was related to the need for more pipes than originally calculated because of a series of problems at the beginning of the perforation, were also defined as root causes. Lessons learned are highlighted.