Hydrothermal Unit Commitment with Deterministic Optimization: Generation and Transmission Including Pumped Storage Units

This work presents a novel approach for solving the short-therm scheduling of hydro-thermal power generation, including pumped storage systemsand transmission constraints. The problem addressed is known as Security Constrained Unit Commitment (SCUC). Pumped Storage Units (PSUs) are importantin elect...

Descripción completa

Detalles Bibliográficos
Autores: Alvarez, Gonzalo Exequiel, Marcovecchio, Marian Gabriela, Aguirre, Pio Antonio
Tipo de recurso: artículo
Estado:Versión publicada
Fecha de publicación:2018
País:Argentina
Institución:Consejo Nacional de Investigaciones Científicas y Técnicas
Repositorio:CONICET Digital (CONICET)
Idioma:inglés
OAI Identifier:oai:ri.conicet.gov.ar:11336/87154
Acceso en línea:http://hdl.handle.net/11336/87154
Access Level:acceso abierto
Palabra clave:Electric power systems
Mixed integer linear programming
Pumped hydro storage
Transmission constraints
https://purl.org/becyt/ford/2.2
https://purl.org/becyt/ford/2
Descripción
Sumario:This work presents a novel approach for solving the short-therm scheduling of hydro-thermal power generation, including pumped storage systemsand transmission constraints. The problem addressed is known as Security Constrained Unit Commitment (SCUC). Pumped Storage Units (PSUs) are importantin electric systems during the off-peak and the peak demand periods, providing economic and technical benefits. Linear aproximations are applied to nonlinear equations of this kind of mathematical problems which are: fuel cost functions, generation-discharge curves of PSUs and transmission constraints modeled with Alternating Current power flow model. Thus, MILP models are presented for the problem addessed. To prove the efficiency of the proposed models, two systems with PSUs will be tested: a modified 6-bus and the IEEE 31-bus power system. Results show that the proposed MILP models allow: modeling the SCUC problem more realistically, obtaining feasible solutions within efficient computational times, and reaching production cost savings up to almost 20% compared to power systems that lack capacities to pumping water. Several indicators obtained from results are presented through graphs, as a tool for improving operation and maintenance of power systems. The analysis of these indicators and the graphic interpretation allow to identify and classify critical parts of systems as well as to make recommendations about future system improvements.