An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities

This paper presents a new MILP mathematical formulation for the scheduling of resource-constrained multiproduct plants involving continuous processes. In such facilities, a sequence of continuous processing steps is usually carried out to produce a significant number of final products and required i...

ver descrição completa

Detalhes bibliográficos
Autores: Mendez, Carlos Alberto, Cerda, Jaime
Formato: artículo
Estado:Versión publicada
Fecha de publicación:2002
País:Argentina
Recursos:Consejo Nacional de Investigaciones Científicas y Técnicas
Repositorio:CONICET Digital (CONICET)
Idioma:inglés
OAI Identifier:oai:ri.conicet.gov.ar:11336/28573
Acesso em linha:http://hdl.handle.net/11336/28573
Access Level:acceso abierto
Palavra-chave:Multiproduct Facilities
Milp Optimization Model
Optimal Operation
Continuous Model
https://purl.org/becyt/ford/2.4
https://purl.org/becyt/ford/2
Descrição
Resumo:This paper presents a new MILP mathematical formulation for the scheduling of resource-constrained multiproduct plants involving continuous processes. In such facilities, a sequence of continuous processing steps is usually carried out to produce a significant number of final products and required intermediates. In order to reduce equipment idle time due to unbalanced stage capacities, storage tanks are available for temporary inventory of intermediates. The problem goal is to maximize the plant economic output while satisfying specified minimum product requirements. The proposed approach relies on a continuous time domain representation that accounts for sequence-dependent changeover times and storage limitations without considering additional tasks. The MILP formulation was applied to a real-world manufacturing facility producing seven intermediates and fifteen final products. Compared with previous scheduling methodologies, the proposed approach yields a much simpler problem representation with a significant saving in 0–1 variables and sequencing constraints. Moreover, it provides a more realistic and profitable production schedule at lower computational cost.