Pérez González, P., & Framiñán Torres, J. M. (2009). Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics.
Citação norma ChicagoPérez González, Paz, e José Manuel Framiñán Torres. Scheduling Permutation Flowshops With Initial Availability Constraint: Analysis of Solutions and Constructive Heuristics. 2009.
Citação norma MLAPérez González, Paz, e José Manuel Framiñán Torres. Scheduling Permutation Flowshops With Initial Availability Constraint: Analysis of Solutions and Constructive Heuristics. 2009.
Nota: a formatação da citação pode não corresponder 100% ao definido pela respectiva norma.