Implementation of PV plants in Spain: a case study
The implementation process of a photovoltaic system and its connection to the national grid in Spain is examined from an economic, an administrative and a legal standpoint. In the first place, this case study describes the solar farm, and it goes on to examine the economic aspects of electricity pro...
| Autores: | , , , |
|---|---|
| Tipo de recurso: | artículo |
| Estado: | Versión aceptada para publicación |
| Fecha de publicación: | 2010 |
| País: | España |
| Institución: | Universidad de Burgos (UBU) |
| Repositorio: | Repositorio Institucional de la Universidad de Burgos (RIUBU) |
| OAI Identifier: | oai:riubu.ubu.es:10259/4754 |
| Acceso en línea: | http://hdl.handle.net/10259/4754 |
| Access Level: | acceso abierto |
| Palabra clave: | PV grid-connected systems PV production PV support Administrative process Electrical engineering Electrotecnia |
| Sumario: | The implementation process of a photovoltaic system and its connection to the national grid in Spain is examined from an economic, an administrative and a legal standpoint. In the first place, this case study describes the solar farm, and it goes on to examine the economic aspects of electricity production, its associated costs, and relevant grants and financial subsidies. Finally, problems related to the administration of the project and the issuing of permits by local and regional authorities are discussed. |
|---|