A systemic approach to investigate the gaps between distribution system operators need and technology developers’ perception—A case study of an intelligent low-voltage grid management system with storage

The purpose of the paper is to introduce a new bi-directional approach to assess the gapbetween the customer needs and technology developers’ perception on the value propositions ofinnovations which includes storages. The paper used two methods; the first comprehensive senseand respond analysis inve...

Descripción completa

Detalles Bibliográficos
Autores: Belay, Alemu Moges, Puranik, Sanket, Díaz González, Francisco|||0000-0002-1912-3014, Tuiskula, Heidi
Tipo de recurso: artículo
Fecha de publicación:2021
País:España
Institución:Universitat Politècnica de Catalunya (UPC)
Repositorio:UPCommons. Portal del coneixement obert de la UPC
Idioma:inglés
OAI Identifier:oai:upcommons.upc.edu:2117/360070
Acceso en línea:https://hdl.handle.net/2117/360070
https://dx.doi.org/10.3390/app11125348
Access Level:acceso abierto
Palabra clave:Low voltage systems
Smart power grids
Energy storage
Distribution system operator
Low voltage grid
Power electronic device
Sense and respond
Smart grid
Storage
Baixa tensió
Xarxes elèctriques intel·ligents
Energia--Emmagatzematge
Àrees temàtiques de la UPC::Energies::Energia elèctrica
Descripción
Sumario:The purpose of the paper is to introduce a new bi-directional approach to assess the gapbetween the customer needs and technology developers’ perception on the value propositions ofinnovations which includes storages. The paper used two methods; the first comprehensive senseand respond analysis investigated technology developers’ perceptions using the value propositionsdefined under the EU-funded H2020 RESOLVD project. The second method focused on customersand collected a survey which covered challenges, value propositions and preparedness to adopt newtechnology. The H2020 RESOLVD project has developed an intelligent low-voltage grid managementsystem with storage. The results from the sense and respond analysis showed that most of thevalue propositions aligned with the responses from the broader survey which are needed within fiveyears (e.g., improved power quality of grid, fault detection, reduced technical loss). However, thecybersecurity perception differed between developers and distribution system operators (DSOs). Thecustomer survey highlighted that certain value propositions of technological solutions are neededmore urgently than others, and therefore, technology developers should prioritize these in furtherdevelopments. Regarding the use of flexibility to manage the LV grid, unclear regulations wereexpressed as a key barrier, thereby affecting business feasibility around battery storage.